Difference between revisions of "Ethereum Shanghai upgrade"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | April 12, 2023 | |
Withdrawal of [[stETH]] holdings will be made available during the next major upgrade after The Merge, known as the Shanghai upgrade. As a result, the assets will remain locked and illiquid for at least 6-12 months after the merger. | Withdrawal of [[stETH]] holdings will be made available during the next major upgrade after The Merge, known as the Shanghai upgrade. As a result, the assets will remain locked and illiquid for at least 6-12 months after the merger. | ||
Line 5: | Line 5: | ||
== Related == | == Related == | ||
* [[The Merge]] | * [[The Merge]] | ||
+ | |||
+ | * [[Ethereum Cancun-Deneb]] | ||
== See also == | == See also == |
Latest revision as of 15:38, 27 May 2024
April 12, 2023
Withdrawal of stETH holdings will be made available during the next major upgrade after The Merge, known as the Shanghai upgrade. As a result, the assets will remain locked and illiquid for at least 6-12 months after the merger.
Related[edit]
See also[edit]
- Ethereum upgrades: The Merge, Bellatrix Beacon Chain, Paris upgrade, Shanghai upgrade, Ethereum Cancun-Deneb, Ethereum scaling solutions, Pectra
- Ethereum 2.0, API, Ethereum tasks, Beacon Chain, Ethereum Staking, validator, Consensus clients, Execution clients, Validation clients, Mainnet, testnets: Prater, Goerli ETH, Inclusion distance, Ethereum attestation, Attestation effectiveness, Attestation Reward Scale, slot, Ethereum upgrades: The Merge, Epoch, Slots, rETH, sETH, stETH, Lido Staked ETH, faucet, Ethereum ports, Subjectivity, Lido Staked ETH, ENR, Sharding,
Ethers.js
, Yellow paper, synchronization, ECFSDS
Advertising: