Difference between revisions of "WARN Local chain is post-merge, waiting for beacon client sync switch-over..."

From wikieduonline
Jump to navigation Jump to search
Line 4: Line 4:
  
 
  Solution: Install and configure your [[consensus client]]
 
  Solution: Install and configure your [[consensus client]]
 +
 +
 +
<code>
 +
.../...
 +
// If we've reached the merge transition but no beacon client is available, or
 +
// it has not yet switched us over, keep warning the user that their infra is
 +
// potentially flaky.
 +
if errors.Is(err, downloader.ErrMergeTransition) && time.Since(cs.warned) > 10*time.Second {
 +
log.Warn("Local chain is post-merge, waiting for beacon client sync switch-over...")
 +
cs.warned = time.Now()
 +
.../...
 +
</code>
  
 
== See also ==
 
== See also ==

Revision as of 12:20, 21 August 2022


WARN Local chain is post-merge, waiting for beacon client sync switch-over... [1]
Solution: Install and configure your consensus client


.../... // If we've reached the merge transition but no beacon client is available, or // it has not yet switched us over, keep warning the user that their infra is // potentially flaky. if errors.Is(err, downloader.ErrMergeTransition) && time.Since(cs.warned) > 10*time.Second { log.Warn("Local chain is post-merge, waiting for beacon client sync switch-over...") cs.warned = time.Now() .../...

See also

  • https://github.com/ethereum/go-ethereum/blob/0ce494b60cd00d70f1f9f2dd0b9bfbd76204168a/eth/sync.go#L133
  • Advertising: